Commit Graph

11 Commits

Author SHA1 Message Date
Angel Capetillo Zavala 4934f99c1d CaCu exports: PDF and XLSX of the complete query and of the patient record
The PDF uses the institutional header, footer and tables with Roboto and the logo, five
stage nodes per row with a detail annex, and segmented risk scales. Excel keeps literal
text and a parameters sheet. Limits are 1000 rows for PDF and 5000 for Excel.
2026-11-27 18:42:48 -06:00
Angel Capetillo Zavala 1b5fa748af CaCu FHIR: follow-up search and filters, stage extensions, and the referral PPV contract test
Patient search accepts follow-up age bounds and a partial name or identifier over the
whole query. Diagnostic reports carry the stage states and dates up to a cut-off. The
integration test expects the referral PPV measures and the screening-round strata of the
cytology distribution, and checks their counts, intervals and nesting.
2026-11-27 18:42:48 -06:00
Roberto Treviño 9c89c9e10d Corrections of study fields; operator flow on ISSSTELEON's test source (SQL Server, two tables of PDFs) 2026-11-27 01:45:16 -06:00
Roberto Treviño cb9115c435 TEA gate, EEG pages, analyze and named training runs 2026-11-26 07:06:52 -06:00
Roberto Treviño 26cf994d1a FHIR, follow-up lists and model jobs by domain; CaMa gate; report download for governance 2026-11-25 23:20:52 -06:00
Roberto Treviño 806302ee5d FHIR out from the catalog, the FHIR door, ConceptMap routes; round-trip, new-label and Synthea gates 2026-11-25 16:17:23 -06:00
Roberto Treviño 0dd5c035bc FHIR R4B API per domain: Patient follow-up list, clinical resources, Measure, MeasureReport, paging, CapabilityStatement; HL7 validator and page gates 2026-11-25 10:21:26 -06:00
Roberto Treviño e2ed1e9dfb Model governance and CaCu measures as FHIR MeasureReports; Phase 2 gate 2026-11-25 01:16:45 -06:00
Roberto Treviño 1c53276b55 Review persons: settle possible splits, correct identity fields; operator test settles everything 2026-11-24 22:35:13 -06:00
Roberto Treviño 326250ffb3 Conectar API: sources, uploads, pipelines, runs, node rows, review; tested end to end 2026-11-24 21:00:52 -06:00
rockdrigo df921f13cd Rebuild: FastAPI skeleton with health, domains, run status and the auth seam
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-24 11:18:08 -06:00