Commit Graph

10 Commits

Author SHA1 Message Date
Roberto Treviño Cervantes bd8c7aa55a Cycle: answer each measure's latest periods after a run, so the first reader finds them stored 2026-11-23 00:06:33 -06:00
Roberto Treviño Cervantes 5738a9c302 Merge dev into the CaMa consolidation branch 2026-11-22 23:28:00 -06:00
Roberto Treviño Cervantes 32483249c7 Indicators cycle recomputes the CaMa survival scenario points over each new build; the figure draws them 2026-11-22 23:22:31 -06:00
Roberto Treviño Cervantes f97d1202a9 Live models: the labelled members are saved once per build and version, prepared by the indicators cycle and loaded by each API worker as it starts 2026-11-22 22:02:04 -06:00
ulises eb88cb7eb0 ADOS-2 scoring step in the indicators cycle, run after the document import commits; EEG analysis ordered before the relation steps 2026-11-22 22:01:50 -06:00
ulises 74303aa1b9 TEA: the cycle's relate_ados2 step between the EEG analysis and the load, and the ADOS-2 relation in FHIR 2026-11-22 21:47:16 -06:00
AlbertoPMDM d35e8bbae9 feat(tea): EEG analysis before the silver load, and its verdict, quality checks and baselines through silver and FHIR 2026-11-19 15:43:27 -06:00
Roberto Treviño Cervantes 854a2e9c55 The recomputation worker estimates with the models in production and wakes on the marker directory; the scanned test form carries a birth date 2026-11-15 05:37:50 -06:00
edgar e224b8b2aa TEA on its new staging: silver load, ten measures answered on request with the status at the period's end, several groups and column strata, and FHIR R4 endpoints for measures, follow-up and patient summary 2026-11-13 15:14:46 -06:00
edgar 73b1db1121 English names: orchestration (cycle, context, runner, repositories), its steps, fields and CLI, recomputation, follow_up and reports 2026-11-13 15:13:52 -06:00