This website requires JavaScript.
Explore
Help
Sign In
ISSSTELEON
/
WebApi
Watch
6
Star
0
Fork
0
You've already forked WebApi
Code
Issues
Pull Requests
1
Actions
Packages
Projects
Releases
Wiki
Activity
Files
2d71fe1103b62373fa2f86bb063bbcf92ccf2bc2
WebApi
/
webapi
/
imports
/
schemas
/
tea
T
History
AlbertoPMDM
d35e8bbae9
feat(tea): EEG analysis before the silver load, and its verdict, quality checks and baselines through silver and FHIR
2026-11-19 15:43:27 -06:00
..
__init__.py
integration layer; merge work on indicators from forks with existing ingestion pipeline
2026-10-23 01:12:43 -06:00
ados2.py
TEA on its new staging: silver load, ten measures answered on request with the status at the period's end, several groups and column strata, and FHIR R4 endpoints for measures, follow-up and patient summary
2026-11-12 15:21:25 -06:00
eeg.py
feat(tea): EEG analysis before the silver load, and its verdict, quality checks and baselines through silver and FHIR
2026-11-19 15:43:27 -06:00
evaluacion_neuropediatrica.py
TEA on its new staging: silver load, ten measures answered on request with the status at the period's end, several groups and column strata, and FHIR R4 endpoints for measures, follow-up and patient summary
2026-11-12 15:21:25 -06:00
mchat.py
TEA on its new staging: silver load, ten measures answered on request with the status at the period's end, several groups and column strata, and FHIR R4 endpoints for measures, follow-up and patient summary
2026-11-12 15:21:25 -06:00
ordenes_estudio.py
TEA: an order carries its study's report as a PDF through the import
2026-11-13 15:03:02 -06:00
pacientes.py
TEA on its new staging: silver load, ten measures answered on request with the status at the period's end, several groups and column strata, and FHIR R4 endpoints for measures, follow-up and patient summary
2026-11-12 15:21:25 -06:00