Preserve dev governance and risk-batch UI. Validate cohort navigation, API contracts and shared summary/history measures. Production build passes; 1785 tests pass with the six known Node 26 localStorage failures.
CAM-01 and CAM-02 already had their KPI cards and history panels waiting for the
catalog; they are now covered with the answers WebApi gives for the synthetic
base, both visible (lowered suppression threshold) and suppressed (normal
threshold). Once published they draw only their KPI card in the summary, as the
mockup does, instead of an extra generic figure card; their evolution stays in
the history.
The stacked history figure now keeps a category the catalog announces even when
no row carries it, so a missing category is named under the figure instead of
silently disappearing. The integration specs also cover the summary and the
history with CAM-01, CAM-02 and CAM-03 published.
The card for cama_histopatologia_birads now shows rates with their Wilson
interval per BI-RADS category and a two-ring donut of the biopsy result, with
group and category selection, period navigation and the published values table.
A pure adapter turns the stratified C2 response into rows and figures; the view
only asks for the data and draws what the adapter returns.
BI-RADS 4 is a row of its own. The denominator is benign, B3, in situ and
invasive; no biopsy and no data are reported apart. A published zero is a zero,
a suppressed cell is suppressed, and a cell or stratum the response does not
carry is unavailable, never zero: no rate or donut total is drawn over an
incomplete matrix. The card keeps its place first in the summary and stays
pending while the catalog does not publish the indicator.
The `birads` stratum is added to the accepted dimensions of the data request.
The CaCu cytology confirmation view is not touched.
GET /<dominio>/seguimiento with the window, page, size, cut-off date and the filters the list announces. Filters and columns come with the answer; only demonstration answers (simulado: true) are accepted and anything outside the contract is rejected before it reaches a view. The fixture is the synthetic answer of the reference prototype and is used by tests only.