ad4edbe2a1
The record reads the RiskAssessment's `estimando` extension and shows the quantity, the outcome, the index date and
the interval's method, and names the table's columns with the quantity and the horizons' unit. Below the table, a
collapsible curve of the risk at each horizon, with its interval as a band (or as error bars when a horizon lacks
one); Plotly is loaded only when it's opened.
(cherry picked from commit 6039e6b741)